Helium Recovery & Purification Equipment

The Helium Recovery and Purification Equipment is designed for helium leak detection production lines. It specifically recovers low-concentration waste helium discharged from the leak detection process, achieving closed-loop helium recycling and reuse. The equipment can collect waste helium with a purity of 25%–70% discharged from exhaust pipelines, and through an online purification process, increase helium purity to above 95%. The treated high-purity helium is transported back to the helium detection gas supply end via pipelines for cyclic use.
The entire recovery and purification process runs automatically online, without the need for manual intermediate handling. It greatly reduces the production line's external helium purchase consumption, effectively cutting production gas costs, while also reducing resource waste caused by direct helium discharge. Balancing economic efficiency and green production needs, it is widely adaptable to various helium leak detection production lines such as new energy and precision components.
Hotline
185 6610 1863
The Helium Recovery and Purification Equipment is designed for helium leak detection production lines. It specifically recovers low-concentration waste helium discharged from the leak detection process, achieving closed-loop helium recycling and reuse. The equipment can collect waste helium with a purity of 25%–70% discharged from exhaust pipelines, and through an online purification process, increase helium purity to above 95%. The treated high-purity helium is transported back to the helium detection gas supply end via pipelines for cyclic use.
The entire recovery and purification process runs automatically online, without the need for manual intermediate handling. It greatly reduces the production line's external helium purchase consumption, effectively cutting production gas costs, while also reducing resource waste caused by direct helium discharge. Balancing economic efficiency and green production needs, it is widely adaptable to various helium leak detection production lines such as new energy and precision components.

Item

Technical Specifications

Remarks

Gas Recovery Rate

30L/min


Gas Collection Purity

≥ 25% He


Gas Supply Purity /
Recovery Rate

Purity ≥60%~99%He,
Recovery Rate ≥60%~80%

The higher the purity,
the lower the recovery rate.

Gas Supply Temperature

Room Temperature ±10°C


Helium Filling Pressure

0.05~0.25MPa (Adjustable)


Control Mode

PLC Full Intelligent Control, Touch Screen


Operation Mode

One-Button Start, Unattended Operation


Equipment Structure

Cabinet Type, with Casters


Equipment Dimensions

900x700x1600 mm (L×W×H)


Live Chat
Contact
  • Ms. Yu
  • 185 6610 1863
  • WeChat:
    WeChat QR Code
  • weiq.sales@weste-group.com